Abstract:In order to improve the permeability and extraction volume of coal seams in high gas and low permeability mines,a directional long borehole hydraulic fracturing technology is proposed,and a three hole fracturing process is designed,including one-time three-stage fracturing,integral fracturing,and one-time two-stage fracturing. After one month of fracturing,the gas concentration in all three holes exceeded 90%,and compared with before fracturing,the gas content in the three holes increased by 10%,30%,and 60% respectively. Compared with the end of the fracturing process,there were increases of 75%,75%,and 90% respectively. Compared with the negative pressure of 15 kPa during extraction,the gas flow rate increased by about 20 times when the negative pressure was 20 kPa,indicating a better gas control effect.